Remediation contractor schedules crews, runs MYOB payroll and sees job margin

We built a Connecteam to MYOB payroll integration, a crew scheduler and a job margin report for a remediation contractor. Jobs come from ServiceM8, crews and timesheets from Connecteam, each week's pay run is exported as a ready-to-import MYOB file, and MYOB revenue and cost are reconciled to each ServiceM8 job for margin by job, client and period.

Published

Outcome

  • 8,146 Crew assignments scheduled since go-live Read-only production count, 29 October 2026.
  • 89% Of scheduled staff-days clocked in Scheduler compared with Connecteam clock-ins, 29 October 2026.
  • 11 days Median from work order to first crew day Work orders since 15 January 2026, measured 29 October 2026.

How it works

  1. 01Jobs and crews arrive

    Work orders from ServiceM8, staff from Connecteam. (ServiceM8)

  2. 02Schedule the week

    Staff-days placed on jobs; totals and history update. (Scheduler)

  3. 03Crews see their jobs

    Assignments are pushed to crew phones. (Connecteam)

  4. 04Clock in, clock out

    Crews clock on under each company's time clock. (Connecteam)

  5. 05Merge and apply pay rules

    Both clocks combined, allowances applied. (Pay and margin rules)

  6. 06Review and export

    Accounts check the pay run and export the MYOB file. (Accounts (MYOB))

    Sign-off
  7. 07Margin by job and period

    MYOB revenue and cost matched to each ServiceM8 job. (Pay and margin rules)

At a glance

Client
Remediation contractor
Industry
Remediation contracting
Workflow
Crew scheduling, payroll and job margin
Built with
Crew scheduler, payroll export and margin reporting
Systems
  • ServiceM8
  • Connecteam
  • MYOB
  • Supabase
Delivered
March 2026

The challenge

The business runs remediation crews from jobs held in ServiceM8. Scheduling lived in two Excel spreadsheets, one for jobs and one for staff, updated by hand many times a day. Nothing linked them to ServiceM8 or to Connecteam, where staff and timesheets live.

Every job change had to be copied across by hand, and only one person really knew how the schedule worked. The business could not see crew utilisation and was wary of bidding for larger projects without confidence it could staff them.

Payroll had its own problem. Running two companies meant two Connecteam time clocks, which breaks the standard Connecteam-to-MYOB link. A third-party portal converted the exports into MYOB files, but it was often down. One week every date came back as 1970 and accounts entered the whole pay run by hand. Meal and per diem allowances were also keyed manually from the job type, every week.

Margin was split the same way. ServiceM8 held each job's quote, completion and labour records, while revenue, invoicing, job costing and payroll sat in MYOB. Margin on a job is only as good as the match between the two, rolled up by client, month, quarter and financial year, and a forecast needed trend from past jobs plus what was already quoted in ServiceM8.

Before and after
AspectBeforeAfter
SchedulingTwo Excel spreadsheets updated by hand all dayOne scheduler synced to ServiceM8 and Connecteam
Who can run itOne person knew how the schedule workedAnyone with access, and a full change history
Job marginRevenue and cost held in two separate systemsReconciled per job, by month, quarter and year
PayrollA conversion portal, allowances keyed by handA MYOB import file per company, reviewed weekly

What we built

We built a crew scheduler laid out like the spreadsheets the team already knew, so adoption did not need retraining. Jobs sync from ServiceM8, staff from Connecteam, and every change is recorded with who made it, in a Sydney-hosted Supabase database. Assignments are pushed back to Connecteam, so crews see their jobs on their phones, and three permission levels let some people only view, some request jobs, and the primary scheduler keep final say.

Payroll was sold and built as a separate module, with no AI step. It pulls timesheets from both Connecteam time clocks by API, merges them, applies the pay rules and nights-away allowances, and produces the MYOB import file after accounts review it. We chose the API over spreadsheet uploads once we proved the pay rules mapped cleanly to MYOB categories.

A margin module followed in the same platform, with no new sign-in. It reconciles MYOB revenue, invoicing, job costing and payroll against each ServiceM8 job record, and reports margin by job, client and cost category for each month, quarter or financial year, with drill-down to the jobs behind a total. A forecast projects revenue and cost from historical trend and quoted ServiceM8 work, using one approach agreed with the finance lead. All of it is calculated by code.

Systems and what each one does
ServiceM8Stays the job system of record; work orders flow into the scheduler automatically, and job, quote and labour records feed the margin report and forecast.
ConnecteamStaff roster and two time clocks in; crew assignments pushed back out to crew phones.
MYOBReceives a 14-column payroll import file each week, one per company, with every export logged, and supplies the revenue, job costing and payroll figures reconciled to each job.
Crew schedulerTwo-timeline calendar of jobs and staff with roles, leave, subcontractors and a full change history.
Margin reportMargin by job, client and period with drill-down and a forecast, inside the same platform.
SupabaseSydney-hosted database that holds the schedule, permissions and audit trail.

Results

The scheduler went live in December 2025 and payroll in March 2026. By late October 2026 the business had scheduled 8,146 crew assignments across 874 jobs in it, handling around 776 schedule changes a week.

The schedule now matches what happens on site. 89% of scheduled staff-days were clocked in by the crew booked, and the median time from a work order to its first crew day is 11 days.

When the person who ran the schedule moved on, a colleague took over inside the same system, with the full history to work from. Payroll no longer depends on the conversion portal.

Since the margin module went live in October 2026, a job has one margin, built from what ServiceM8 says was done and what MYOB says was invoiced and paid. The reports show the data as recorded, so a gap in either system is visible rather than hidden.

Return on investment

Projected
Saving
54 hrs a month
Payback
9 months

Before: scheduler and accounts time was never timed. After: about 5 hours a week keeping the schedule instead of 15, and 30 minutes on the weekly pay run instead of 3 hours, over about 4.3 weeks a month at $75 an hour (projected).

Results
8,146 Crew assignments scheduled in the system, across 874 jobs.Read-only production count, 29 October 2026.
89% Of scheduled staff-days were clocked in (4,622 of 5,174).Scheduler compared with Connecteam clock-ins, 29 October 2026.
11 days Median from work order to first crew day (90% within 30 days).Work orders since 15 January 2026, measured 29 October 2026.
30 min Accounts time per weekly pay run now, down from about 3 hours.Projected from the build.
370 Jobs reported on with margin since go-live.Projected from the number of completed jobs.
3 Margin period views, month, quarter and financial year, each with drill-down to jobs.Module design, signed proposal.

What we’d do again

  • Copy the layout people trust. Matching the old spreadsheet's shape made the switch a non-event for the scheduler.
  • Prove the mapping before choosing the integration. The API route only became the default once pay rule IDs were shown to map onto MYOB categories; file upload stayed as a fallback.
  • Count before automating further. Measuring the schedule showed jobs carry no duration or crew-size data yet, so the first thing to add is clash detection.
  • Keep payroll a reviewed export. The module builds the MYOB file and logs it, and accounts decide what goes in.
  • Report margin from the data as recorded. The module does not cleanse ServiceM8 or MYOB, so a job with a missing cost or an odd code shows up and gets fixed at the source.
  • Agree one forecasting approach. Assumptions were set with the finance lead against real data, instead of building every scenario someone might ask for.